Brandt Companies Meets Tight Project Deadline with HoldRite
For more than 15 years, Brandt Companies has used HoldRite products to meet aggressive deadlines on the job site. To efficiently construct a 12-story assisted living facility in Dallas, Project Superintendent Andrew Meshell and Project Manager Spencer Jackson once again chose HoldRite’s engineered solutions.
For in wall rough in plumbing, the team secured pipes with HoldRite stout and copper brackets and clamps. Not only do they offer the right pipe support, but they also lock the measurement down so the team doesn’t have to worry about the under slab rough-in being off when they come back to install fixtures. The brackets give contractors peace of mind that the pipes are secured in the wall right where they need to be.