Drop-In & Under Deck Firestop Devices | HoldRite HydroFlame
Firestopping pipe penetrations is an important part of commercial construction, but it can also be time-consuming and inconsistent when using traditional methods. That's why HoldRite developed HydroFlame™ Drop-In (DID) and Under Deck (UDD) Firestop Devices. It’s a simple solution designed to help you install firestop systems faster while supporting code compliance.
Simplify Firestop Installation
The innovative clamshell-style design wraps around the penetrant, making installation quick and consistent while simplifying retrofit applications where piping is already installed. Instead of relying on field-built methods, this standardized solution helps create repeatable results across the jobsite.
Whether you're working on new construction or retrofit applications, these devices can be installed:
- From the top side or underside of the deck.
- Before or after pipe installation.
- In corrugated metal, flat form, and precast deck applications.
- With non-metallic, metallic, and insulated metallic pipes.
Fire, Smoke, and Code Compliance
HydroFlame Drop-In and Under Deck Devices combine multiple layers of protection in a single solution. The devices incorporate firestop materials and smoke-sealing components designed to help maintain the integrity of rated floor assemblies.
The devices are:
- UL Fire Tested and Listed.
- Tested to ASTM E814, UL 1479, and CAN/ULC S 115 Testing Standards.
- Available with typical 2- or 3-hour F-ratings, depending on concrete thickness and the applicable UL system.
Built for a Wide Range of Applications
Commercial jobs rarely present the same installation conditions from floor to floor. HydroFlame devices are engineered to accommodate a broad range of applications, including:
- Plastic piping
- Metallic piping
- Insulated metallic piping
- New construction projects
- Retrofit installations
- Precast and hollow-core systems
Optional accessories include sheet metal sleeves for precast applications and OSHA-compliant safety caps for Drop-In Devices. Check out HoldRite’s entire offering below.
Discover: HoldRite Drop-In Devices
Install Steps: Drop-In Devices
Always follow the applicable UL system and current HoldRite installation instructions.
For new installations (before pipe is installed):
- Core drill the hole to the required size.
- Insert the Drop-In Device into the opening.
- Secure with two approved fasteners.
- (Optional) Install the safety cap.
- Remove the cap and install the pipe through the device.
- Apply sealant if required by the UL system.
For retrofit applications (pipe already installed):
- Confirm the pipe is centered in the opening.
- Open the clamshell device and wrap it around the pipe.
- Close and latch the device.
- Insert into the opening and secure with two approved fasteners.
- Apply sealant if required by the UL system.
Install Steps: Under Deck Devices
Always follow the applicable UL system and current HoldRite installation instructions.
For new installations (before pipe is installed):
- Core drill the hole through the deck and concrete.
- Install the Under Deck Device from below.
- Secure with a minimum of four approved fasteners.
- (Optional) Install the hole cover.
- Remove the cover and install the pipe.
- Apply sealant if required by the UL system.
For retrofit applications (pipe already installed):
- Ensure the pipe is centered in the opening.
- Open the clamshell device and place it around the pipe.
- Close and latch the device.
- Secure with a minimum of four approved fasteners.
- Apply sealant if required by the UL system.
